Product Details:
Payment & Shipping Terms:
|
Name: | Boiler Super Heater | Style: | CFB Boiler |
---|---|---|---|
Weight: | 10~1000ton | Output: | Hot Water/Steam |
Fuel: | Coal/Gas/Oil-fired, Water Heat | Dimension(L*W*H): | Customization |
Keywords: | Boiler Super Heater | Pressure: | High、Low Pressure |
Application: | Power Plant Boiler | Tube: | Hot Rolled Seamless Steel Tube |
Highlight: | boiler superheater,superheater tubes |
High Strength CFB Boiler Super Heater With Hot Rolled Seamless Steel Tube
Boiler Super Heater Details
Superheating raises overall efficiency as well as avoids too much condensation in last stages of turbine which avoids blade erosion.
The heat of combustion gases from furnace is utilised for removal of moisture from steam and to superheat the steam.
Super-heaters ususlly have several tube circuits in parallel with one or more return bends,connected between headers.
Heat from the hot gases to the vapour in the surperheater is transferred at high temperatures.
Therefore promary section of superheater is arranged in counterflow and secondary section in parallel flow to reduce the temp.stressing of the tube wall.
Boiler Super Heater Applications:
The main Petrochemical Natural Gas heat boiler super heater is Widely used for power plant, power station, etc.
Hot rolled seamless steel tubes and cold rolled seamless steel tubes for steam boiler systems
1.Implementation of the same standard, medium and low pressure boiler tube standards can be used. Hot rolled or cold-rolled (drawn) seamless steel tubes with high quality carbon structural steel.
2.The 2 main 10, 20 steel manufacturing, in addition to ensure the chemical composition and mechanical properties of things do pressure test, curling, flaring and flattening test.
3.Hot rolling in hot rolling, cold rolling (DIAL) in heat treatment delivery.
Boiler Parts
Boiler Drum,Boiler Waterwall Panel,Boiler Economizer,Boiler Header,Boiler Cyclone Separator,Boiler Chimney Flue Pipe,Boiler Air Preheater,Boiler Air Preheater
Commerce Terms:
Minimum Order Quantity: | 1 Piece |
Price: | US $10000 - 50000 / Set | Contact Me Get Latest Price |
Packaging Details: | Iron Frame Package |
Delivery Time: | 50~100 Days |
Payment Terms: | Payment by T/T, Payment percentage can be negotiated according to actual situation.The balance against the receipt of the correct test certificates or as per customer’s suggestion. |
Supply Ability: | 300Ton/Tons per Month |
Production Line Quality Control:
1. Strength calculation report with applied materials information;
2. 100%NDT(non-destructive inspection) report of steel plate, tube and welding rod;
3. 100%X-ray inspection report (welding seam): to ensure the quality of the entire boiler;
4. Hydraulic test report: ensure the standard working pressure and safety
Packing Details: We have standard seaworthy package and we also could try our best to package the product to meet your requirement.
Delivery Details: We have the most reliable transportation to make sure your goods arrived your destination as soon as possible.
About US
Suzhou ORL Power Engineering Co., Ltd.is located in Suzhou, Jiangsu Province.
ORL Power is a leading company and exporter of industrial boilers,power plant boilersand boiler parts (including steam drum, membrane waterwall panel,header,economizer, evaporator, superheater,H-fin economizer, spiral fin tube, air preheater, heat pipe, flue etc.), seamless steel tubes/pipes and ERW steel pipes.ORL provides our customer with full range of services including boiler design, fabrication, installation and commissioning, boiler maintenance, and supervision at site. Our product and service include design and manufacture industrial boilers, pressure vessels and tanks, and pressure parts for power plant boilers (600MW, or 1000MW).
Contact Person: Mr. Allen Liu
Tel: 18550138377
Fax: 86-512-56761658