Product Details:
Payment & Shipping Terms:
|
Condition: | New | Type: | Natural Circulation/Once Through |
---|---|---|---|
Usage: | Industry/Power Station | Structure: | Fire/Water Tube |
Pressure: | High/Low Pressure | Certification: | ISO9001/SGS/TUV/ASME/EN |
Fuel: | Coal/Gas/Oil-fired, Water Heat | Output: | Hot Water/Steam |
Dimension(L*W*H): | Customization | Weight: | 10~1000ton |
Keywords: | Boiler Drum | Application: | Power Plant Boiler Or Industry Boiler |
Highlight: | boiler drum,high pressure drum |
Gas Steam CFB Boiler Drum Water Heat Non Pollution Boiler Equipment
CFB Boiler Drum
Product Name
|
Power Plan Boiler steam drum / water drum
|
Applied Area
|
Natural circulation boiler
|
Drum Shell Plate Material
|
- Carbon Steel : Q245R, P265GH, SA516-Gr.60/65/70
- Alloy Steel : Q345R, Q375R, 15CrMoR, 12Cr1MoVR, P355GH , DIWA353
|
Drum Head Material
|
Same as shell
|
Nozzle Tube Material
|
As per design
|
Standard
|
China GB, ASME, EN
|
Manufacturer Grade
|
China A Grade, ABS Certificated, TUV Certificated
|
Working Temperature
|
Saturation Temperature at rated pressure
|
Working Pressure
|
1.6 MPa ~ 22.5 MPa
|
Shell Plate Thickness
(Drum Wall Thickness)
|
≤150 mm
|
Drum Diameter
|
≤3,200 mm
|
Drum Length
|
≤25,000 mm
|
Welding
|
- Shell : SMAW, SAW
- Nozzle tube : GTAW (TIG), SMAW
|
Welding NDT
|
- Shell longitudinal seam : 100% RT, 100% UT
- Shell circumferential seam : 100% RT, 15% UT
- Nozzle tube angle seam : 100% UT, 100% MT
|
Boiler Parts
Boiler Drum,Boiler Waterwall Panel,Boiler Economizer,Boiler Header,Boiler Cyclone Separator,Boiler Chimney Flue Pipe,Boiler Air Preheater,Boiler Air Preheater
Boiler Parts
Boiler Super Heater,Boiler High Temp Superheater,Boiler Cyclone Separator,Boiler Flue,Boiler Heat Pipe Air Preheater,Boiler Gen Bank,Boiler Heat Pipe Elements,Boiler Tube Pin,Boiler Tubeshield,Boiler Ditch Tube
Name&Type | Supply Ability: | FOB Price |
Boiler drum | 100Ton/Tons per Month | Contact Me Get Latest Price |
Boiler header | 100Ton/Tons per Month | Contact Me Get Latest Price |
Boiler waterwall panel | 500Ton/Tons per Month | Contact Me Get Latest Price |
Boiler economizer | 500Ton/Tons per Month | Contact Me Get Latest Price |
Boiler super heater | 300Ton/Tons per Month | Contact Me Get Latest Price |
Boiler air preheater | 300Ton/Tons per Month | Contact Me Get Latest Price |
Other | 300Ton/Tons per Month | Contact Me Get Latest Price |
Contact Information
Product Description
Boiler Parts
Boiler Drum,Boiler Waterwall Panel,Boiler Economizer,Boiler Header,Boiler Cyclone Separator,Boiler Chimney Flue Pipe,Boiler Air Preheater,Boiler Air Preheater
Boiler Parts
Boiler Super Heater,Boiler High Temp Superheater,Boiler Cyclone Separator,Boiler Flue,Boiler Heat Pipe Air Preheater,Boiler Gen Bank,Boiler Heat Pipe Elements,Boiler Tube Pin,Boiler Tubeshield,Boiler Ditch Tube
Boiler Product Production
Boiler Cyclone Separator WorkShop, Boiler Coil Workshop, Boiler Waterwall Workshop.
Testing Center
Boiler Product Test
Impact test,The scene to examine the water-wall,Industrial TV monitoring,Snake-like pipe water pressure test,Header endoscopic detection,Header weld inspection
Packaging & Shipping
Trading Process
ORL offers prompt response, professional products, and all-around service to our customers. Our experienced sales team and engineers are waiting for your enquiry and ready to provide sincere service. We cordially welcome domestic and overseas friends to visit our company and manufacturing bases, and look forward to building up long-term, mutual cooperative relationship with you.
contact information
ADD: 11 East Renmin Road, Zhangjiagang City, Jiangsu, China
Phone:+86 0512-56770166
E-mail: info@orlpower.com
Website: www.boiler-units.com
Contact Person: Mr. Allen Liu
Tel: 18550138377
Fax: 86-512-56761658